1) To perform the initial setting time test, the water is added to thecement at the rate of ——— by weight of cement 2) Stair in which the stringer as well as the hand rail […]

Overseer (Civil) model questions Test paper 8
Spread the love
1) To perform the initial setting time test, the water is added to thecement at the rate of ——— by weight of cement 2) Stair in which the stringer as well as the hand rail […]
1) The Weber number is the ratio of 2) For estimating the peak run off the rational formula Q=0.0278 KpAwas evolved by 3) The percentage of gypsum added to cement clinker is 4) Brick noggin […]
1) Which type of welding process is used for welding of structures ? 2) In 1000 kg of sewage, the total solid approximate 3) The door used in places where frequent opening and closing of […]
1) The equivalent length of a column fixed at both end, is 2) The colour of light used for visibility in fog is 3) The boundary between felsic and mafic rocks of the crust is […]
1) A land is known as waterlogged 2) The skirting/dado in a bathroom should be up to 3) The material generally not used as extender in paints, is 4) Which of the following variety of […]